Hurst Conference Center 3-Level Overbuild to Existing Hybrid Parking Structure – Hurst, TX
Hybrid Parking Deck
Service
Hybrid Parking Deck
General Contractor
AUI Commercial, LLC
Owner
City of Hurst
Challenge
Erecting three additional levels on top of an existing structure while keeping the existing bottom level open for fire lane code adherence and not interfering with the loading dock for the adjacent conference center.
ASC Solution
Offered extensive hybrid parking deck design and construction experience as well as providing the best price while being able to meet the customer’s desired complete date.